Cannon Lane

Tonbridge

Following Ardent’s comprehensive flood risk assessment, Ardent were retained by Ward Homes to provide a spectrum of pre-planning support and detailed infrastructure design design for a proposed innovative mixed use development in an area of functional flood plain adjacent the River Medway. The full extent of the proposed development comprises circa 200 residential units and 2 commercial units, proposed over 3 phases. Ardent’s scope of commission included the following:

Pre Planning:

  • Transport Assessment
  • Travel Plans
  • Layout Advice
  • Flood Risk Assessment
  • Detail Flood Modelling
  • Foul and Surface Water Drainage Strategy
  • Procurement and Appraisal of Geotechnical Surveys
  • Noise Impact Assessment
  • Assessment of existing and proposed utilities
  • Obtain Environment Agency consents
  • Preparation of evidence to discharge of pre-commencement conditions

Tender and Construction Stage:

  • Design of Section 38 Highways and section 278 works
  • Design of Section 104 Sewers
  • Private building drainage design
  • Preparation of finished floor levels
  • External groundworks design
  • Detailed flood compensation and modeling
  • Preparation of construction drawings
  • Site Support

 

cannon-lane